The Beginnings - 1988 Camaro IROC-Z Convertible - To Do List

 

TO DO List

P Status
Pick up Camaro with Trailer 1  Completed
Find Donor Car with 5.7L TPI  Engine 1  Completed
Remove Engine from Donor Car 1  Completed
Rebuilt Engine from Donor Car 1  Completed
Send Heads for testing 1  Completed
Replace heads with Rebuilds 1  Completed
Clean Block and Paint 1  Completed
Clean TPI Aluminum components 1  Completed
Re-Assemble Engine 1  Completed
Install Engine & Transmission 1  Completed
Sandblast & Paint rear axle 1  Completed
Replace Fuel Sender & Strainer 1  Completed
Change Gas Tank for Fuel Injection from Donor car 1  Completed
Install new rear end with Disc Brakes from Donor car 1  Completed
Install Front Torsion & WonderBar 1  Completed
Connect Fuel lines 1  Completed
Install MAF Sensor 1  Completed
Install Exhaust System 1  Completed
Change Oil Filter & Add Engine Oil 1  Completed
Install Air Filters 1  Completed
Replace rear axle brake lines and install Rear Brakes 1  Completed
Change Master Cylinder & Proportioning Valve for rear disc brakes. 1  Completed
Install Drive shaft with new U-Joint 1  Completed
Install cooling fans from donor car 1  Completed
Install Exhaust Manifolds 1  Completed
Install Transmission cooling lines 1  Completed
Bleed Brake System 1  Completed
Install Hood Hinges 1  Completed
Install Heater Hoses 1  Completed
Install Radiator hoses 1  Completed
Install Oil cooling lines 1  Completed
Connect starter 1  Completed
Install Spark Plugs 1  Completed
Install Cap & Rotor 1  Completed
Install Emissions (AIR) System 1  Completed
Install Hood Hinges 1  Completed
Move wiring connector from Passenger side to Driver side. 1  Completed
Install battery connections 1  Completed
Install Brake Vacuum 1  Completed
Install AC Compressor 1  Completed
Install Serpentine Belt 1  Completed
Install Plug Wires 1  Completed
Connect Ground Wires & Battery to Starter 1  Completed
Install new Battery 1  Completed
Vacuum Lines 1  Completed
Add Transmission Fluid 1  Completed
Add Coolant 1  Completed
Add Fuel! 1  Completed
Start Car!!!  Check all fluids. 1  Completed
Replace Interior w/ Gray Firebird Interior - Interior swapped, seats& Front Belts  now out for repair. 2   Completed
Change Dash with new dash w/AC 2   Completed
Replace Brake Vacuum Switch 2  Completed
Replace Steering Column w/ Auto Column 2  Completed
Merge Under dash Wiring harness for Auto Shift Safety & Computer controls 2  Completed
Re-assemble dash and console 2  Completed
Adjust Parking Brake 2  Completed
Install AC Components - Tighten Fittings and Mount 2 Completed
Mount ECM 2  Completed
Change under dash vents for A/C 2 Completed
Change Brake Peddle for Auto Trans Brake Peddle 2 Completed
Find 13MM 3/8 drive deep socket - Lost in Garage 4  Completed
Install Light Holder under dash  2  Completed
Replace O2 Sensor  2  Completed
Paint under hood while still off car 2  Completed
Install Hood 2  Completed
Check for Rattle under car 2  Completed
Install old Seats, Seats Belts and Sail Panels when back from repair 2  Completed
Change Insurance 2  Completed
Install Stereo and speakers 3  Completed
Hook up Ground and bolt down pipe at rear of engine 2  Completed
Check Reverse light Wiring 2  Completed
Check car for safety before sending to Mechanic 2  Completed
Check Temperature send unit for error 2  Completed
Ship car to Hamilton for Safety and Emissions Testing 2  Completed
Register ownership, Pay PST 2  Completed
Paint inside engine compartment 3  Completed
Four Wheel Alignment 2  Completed
Install clip for Flasher 4  
Fill holes under hood 3  Completed
Clean wheel wells from slick rubber 4  Completed
Install new front seats (in Shipping from PA) 4  Completed
Paint Touch-up 3  Completed
Get Appraisal 4  Completed
Repair Passenger side power Door Lock, won't unlock 4  Completed
Strip Race rims and polish 4  Completed
Install Slicks on Race rims 4  Completed
Replace Drivers side kick panel 4  Completed
Screw down trim 4 Completed
Repair spot on trunk lid underside 4 Completed
Install Plastic panels under front of car 4
Install new Stereo CD 4  Completed
Install R134a A/C Conversion Kit (Include new Evaporator) 4  Completed
Charge A/C - Hamilton (Change Line and Replace Compressor) 4 Completed
Coat Leather steering wheel 4  Completed
Replace Ignition Cylinder with New 4  Completed
Replace Centre Link and Idler Arm with new 4
Install drivers side Power Seat Track 4 Completed
Install Chevrolet A/C Controller 4 Completed
Repair Cruise Control 4  Completed
Replace Temperature Sender 4 Completed
Strip car for painting 5 Completed
Clean ground effects, etc with pressure sprayer, prepare for painting 5 Completed
Paint Car 5 Completed
Replace Convertible Top (Danaged ffrom flying wood on highway) 5 Completed
Re-assemble car after paint 5 Completed